Artifact FA-109The House Borrowed from Thursday
Floor I

Yesterday’s Foundation

Borrow the cracked steps from Ruin. Bridge Now without repairing them.

Now has a broken bridge. Shift to Ruin and inspect the cracked steps in the tower.
Held lineageNothing held

Borrow from a later age.

Snap 01/16
The five Promises

Floors of Thursday

Promised floors remain open for study. The twelve remix lots appear after the roof reaches the hearth.

ROUTE
PROMISED
Floor I held

Yesterday reaches the hearth

The sixth seal

One room in all three ages

Morning, evening, and ruin enter the same hearth. The house is not repaired. It is finally shared.

House settings

Settle the century

Blueprint codec

Progress and up to ten blueprints stay in this browser. The artifact sends no data and makes no network request. Original design, code, shaders, vectors, and synthesized sound by Fantery.